Bauknecht GSI 5994 IN Bedienungsanleitung Seite 6

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 16
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 5
6
6. Open tap operation
7. First cycle operation
OPEN TAP
OPERATION
Check water tap is open. If closed, open it then confirm by pressing
button.
PLEASE OPEN
fflst = DONE
THE WATER TAP
fflst = DONE
FIRST CYCLE
OPERATION
Before normal use of appliance it is recommended to run Intensive cycle first, to calibrate the
appliance.
Insert a detergent into dispenser chamber A (see below), then press .
Press button to choose Intensive program, press and close the appliance door.
This first cycle can be up to 20 minutes longer as a result of the automatic calibration process.
After this process the appliance is ready for normal use.
PLEASE RUN THE
fflst = OK
INTENSIVE CYCLE
fflst = OK
TO COMPLETE THE
fflst = OK
SETUP
fflst = OK
Seitenansicht 5
1 2 3 4 5 6 7 8 9 10 11 ... 15 16

Kommentare zu diesen Handbüchern

Keine Kommentare